联系我们

公司名称:XXX

电话:XXX

手机:XXX

联系人:XXX

地址:XXX

新闻动态
混凝土施工的准备
混凝土施工的准备
Preparation of concrete construction
技术准备
Technical preparation
混凝土浇筑前,首先对模板内的杂物安排专人进行清理,然后用空压机对模板上的灰尘吹风及高压水泵用水冲洗模板内表面(灰尘及其他杂物从排水孔吹走),并用吸尘器将杂物清理干净。自检合格后报请监理工程师按照设计图纸核对钢筋布置,检查结构断面尺寸误差是否符合规定,模板接缝情况及表面平整光洁度。对U型槽内模支架体系进行全面安全检查,重点对支架的剪力撑设置数量、上下顶托的旋紧情况,确保支架体系安装牢固安全。以上情况逐项检查、验收,合格后方可进行混凝土浇筑。
Before pouring concrete, we should first arrange the special objects in the template to clean up, then use the air compressor to wash the dust on the template and to wash the inner surface of the mould (the dust and other materials) from the drains, and clean up the debris with vacuum cleaner. After self inspection, report to the supervising engineer to check the layout of the reinforcement according to the design drawings, check whether the size error of the structural section is in conformity with the requirements, the joint condition of the template and the surface finish and finish. To conduct a comprehensive safety inspection of U type groove mould bracket system, the key to the support set screw bracket shear quantity, upper and lower backwater, to ensure that the support system of firm and safe installation. The above conditions are checked and checked item by item. Concrete pouring can be carried out after the qualification is qualified.

联系方式

  1. 公司名称:XXX
  2. 电话:XXX
  3. 手机:XXX
  4. 联系人:XXX
  5. 地址:XXX

版权 © 保定市u型槽模具厂 网址:http://uxingcao.89ix.com  推荐:u型槽模具,混凝土u型槽模具,U型槽塑料模具

网站建设及优化保定遨游网络公司